Construction of a 600mm U-Drain with Slab ,70m long,1.5mX 1.5M Storm drain,40m and 1.5mx 2.0 Double cell Box Culvert.
This project is disclosed by Sekondi-Takoradi Metropolitan Assembly. Citizens have the right to ask questions about public infrastructure.